Elizabeth Quay

A landmark mixed-use development connecting Perth’s CBD to the northern shore of the Swan River, Elizabeth Quay’s ambitious construction included creating a new artificial inlet surrounded by nine major building sites, as well as rerouting surrounding roads.

We were engaged by CPB Contracting to provide concrete encasements for over 650 ductile iron access covers, all with stainless steel trim.

  • 650 access cover encasements
  • 230 tons of concrete
  • Turnaround time: 40 weeks
  • Managed a busy site by casting offsite

"Construction of the water front precinct Elizabeth Quay within the Perth CBD required a significant number of encased access covers to suit service pits already installed throughout the site. The number of covers, along with a congested construction made on-site encasement difficult. We were able supply over 600 pits covers within a very tight time frame on budget and on spec."

Mark Quan, Cascada Group – Sales Manager