Fluid Thinking.

Solid Solutions.

Whatever concrete, ferrous and plastic products you need.

Whenever and wherever you need them.

About Us

Who are we? Cascada. We source, design and manufacture products for Western Australian civil, industrial and residential construction companies. And crucially, we deliver them – on spec, on time and on budget – whenever and wherever they’re needed.

We work in concrete, in metal, in plastic. But most importantly, we work in close collaboration with our partners and customers to find innovative, cost-effective solutions.

It’s what we’ve been doing for clients throughout WA since 2004 – previously as Icon Septech (WA), now as Cascada – so we know our stuff. And yours.

Our Approach

From precast concrete, to ferrous products, to plastic pits, we’ll source, engineer and fabricate whatever you need. More than that, we’ll do it in a way that fits your project and processes like a glove, working with you to ensure we hit our deadlines, so you hit yours.

And so, we do more than deliver products. We develop solutions. We relish challenges and overcome obstacles. If we can’t find the ideal product, we’ll design and fabricate it. If it hasn’t been done before, we’ll find a way.

In short, we do whatever it takes. No challenge is too big, complex or remote.

The Bottom Line

Clients choose us because we have the proven experience, technical acumen and local knowledge to ensure we deliver the highest quality products, as specified, without compromising time, budgets, safety or finish.

Because we’ll work in partnership with you, not only sharing our insights and ideas, but integrating – and adding value – seamlessly within your process and value chain.

And because, beyond minimising costs, improving aesthetics and streamlining approvals and installation, our fluid approach gives you the freedom and confidence to think outside the box.

Custom

Custom

  • Bespoke pits, footings and slabs
  • Environmental catchment systems
Drainage

Drainage

  • Access covers and grates
  • Chamber systems
  • Culverts
Electrical

Electrical

  • Communication and signalling pits
  • Foundation footings
  • Bespoke pits
Main Roads

Main Roads

  • Main roads access covers and grates
  • Main roads culvert
  • Noise walls
Ferrous

Ferrous

  • Access covers and grates
  • Decorative trim covers
  • Multiparts
Sewer

Sewer

  • Type 1 and Type 8 covers
  • Pump station covers
  • Air and valve pits
Custom

Custom

  • Bespoke pits, footings and slabs
  • Environmental catchment systems
Drainage

Drainage

  • Access covers and grates
  • Chamber systems
  • Culverts

Roy Hill

Case Study 3

Roy Hill is a 55 million tonne per annum iron ore project in the Pilbara, comprising an open pit mine, processing plant, 344km heavy haul railway and dedicated port facility at Port Hedland. We supplied an array of products to a range of contractors during the project’s development phase.

  • 690 custom 1200 and 900mm communications and electrical pits
  • Custom concrete foundations for rail and signalling equipment
    • Manufactured in split parts for transport
  • Custom concrete communications chambers, including:
    • 16km of 100mm PVC communications conduit
    • 16km of telecommunications pull-through rope
  • Over 1,500 tons of concrete
  • Total project value: $2.0m

New Perth Stadium

Case Study 1

Perth’s new 60,000-seat, multi-purpose stadium will provide world-class facilities for a range of sporting and entertainment events – the centrepiece of an integrated entertainment precinct that includes a major new railway station and pedestrian bridge over the Swan River.

In partnership with Sanwell Plumbing & Civil, we collaborated with the project’s structural engineers to design and fabricate a high-spec stormwater solution comprising 18 custom-built Class E pits.

  • High-spec bespoke solution
  • 18 Class E pits (1000x1000x1500)
  • Varied penetrations
  • Cast offsite with a two-stage installation process
  • Quick turnaround and tight delivery schedule

Elizabeth Quay

Case Study 2

A landmark mixed-use development connecting Perth’s CBD to the northern shore of the Swan River, Elizabeth Quay’s ambitious construction included creating a new artificial inlet surrounded by nine major building sites, as well as rerouting surrounding roads.

We were engaged by CPB Contracting to provide concrete encasements for over 650 ductile iron access covers, all with stainless steel trim.

  • 650 access cover encasements
  • 230 tons of concrete
  • Turnaround time: 40 weeks
  • Managed a busy site by casting offsite

Roy Hill

Case Study 3

Roy Hill is a 55 million tonne per annum iron ore project in the Pilbara, comprising an open pit mine, processing plant, 344km heavy haul railway and dedicated port facility at Port Hedland. We supplied an array of products to a range of contractors during the project’s development phase.

  • 690 custom 1200 and 900mm communications and electrical pits
  • Custom concrete foundations for rail and signalling equipment
    • Manufactured in split parts for transport
  • Custom concrete communications chambers, including:
    • 16km of 100mm PVC communications conduit
    • 16km of telecommunications pull-through rope
  • Over 1,500 tons of concrete
  • Total project value: $2.0m

New Perth Stadium

Case Study 1

Perth’s new 60,000-seat, multi-purpose stadium will provide world-class facilities for a range of sporting and entertainment events – the centrepiece of an integrated entertainment precinct that includes a major new railway station and pedestrian bridge over the Swan River.

In partnership with Sanwell Plumbing & Civil, we collaborated with the project’s structural engineers to design and fabricate a high-spec stormwater solution comprising 18 custom-built Class E pits.

  • High-spec bespoke solution
  • 18 Class E pits (1000x1000x1500)
  • Varied penetrations
  • Cast offsite with a two-stage installation process
  • Quick turnaround and tight delivery schedule